What is included in a Control4 price
Design and specification, the hardware, the cabling share, programming by our own engineers, commissioning room by room with you present, documentation in the Client Portal and handover training. There are no separate programming or commissioning lines that appear after you have signed, and the first year of Control4 Connect is in. What is not included is the work of other trades: the electrician's containment on a new build, joinery for a media wall, the fabric of a cinema room beyond the equipment.
Apartment against villa
The difference is room count, not platform. A two-bedroom apartment has 19 lighting zones and one controller, and lands in the Signature tier at AED 92,000 – 187,000 once shading, music and a proper network are in. A six-bedroom villa has 43 zones, 11 climate zones, 8 cameras and a garden to cover with Wi-Fi, and lands at AED 262,500 – 545,000. Apartments and penthouses also skip the outdoor layer entirely, which is why their networks and audio cost less.
Taking over an existing Control4 system instead
If the house already runs Control4 and the installer has gone, the answer is rarely a new system. A takeover moves the dealer relationship to us, recovers the project and audits the hardware; most cost a fraction of the ranges above and need no new equipment beyond a dead driver or an ageing controller. An OS 3 to X4 migration on a well-built system is often a controller (AED 3,570 – 12,240) plus a day of programming.
Control4 takeover in Dubai →OS 3 to X4: the upgrade worth doing →
How to get a real number
Build your villa room by room in the quote builder and it prices from exactly these rows, with a live AED range before you give us a name. Then book the survey: AED 1,500, credited in full against the project. We do not price a property we have not seen, and we would be careful with anyone who does.